Ramelius Announces High Grade Results at Wattle Dam
The directors of Ramelius Resources Limited are pleased to prprocesos de triturar un material de una planta de mineralesovide the following update on drilling results at Wattle Dam.
Results for a further six holes have been received from underground drilling of the new down plunge zone at Wattle Dam with high grade gold intercepts shown below:
- WDUD0160 ‐ 8m @ 6.6 g/t Au from 149m down hole
- WDUD0163 ‐ 9m @ 5.4g/t Au from 160m down hole
- WDUD0165 ‐ 9m @ 3.3 g/t Au from 162m down hole
- WDUD0167*‐ 19m @ 86 g/t Au from 129m down hole including individual one metre intersections of 1500 g/t (48 oz/t) Au and 106g/t (3.4 oz/t) Au
- WDUD0168*‐ 17m @ 15.4 g/t Au from 175m down hole including individual one metre intersections of 37 g/t Au, 20 g/t Au, 25 g/t Au, 19 g/t Au, 95 g/t (3 oz/t) Au and 21 g/t Au
Further drilling of this zone and deeper holes will be conducted once the decline has been extended to the 100m RL, which is expected to take approximately three months.
0 comentarios