What is often a stone production line and main equipment
Let's check out the crusher impact crusher works it, so that it will determine if the problem if your device is in place first impact crusher how the work of high-speed rotation in the rotor of the hammer, getting into the cavity within the material produce high-speed impact and crushing, therefore, the material has long been broken along the tangent direction at high-speed threw back the other side of your crushing chamber board, again broken, and after that rebounded back plate to plate and from the hammer and always repeat the process during the round-trip in route, certain not to miss strike against 1 another the role of materials with the material by plate hammer blow, as well as the back plate as well as impact of your collision amongst the material, the content constantly cracks, loose walls crushed if the particle size is below the spine plate and the plate the gap amongst the hammer if it was unloaded.? iron ore beneficiation plant
It is traditionally used in electricity, water, highway, etc. Stone production line broken three-cavity area, rotor sleeve keyless connection, high wear-resistant plate hammer, insert cellular phone form, tilt bearing, unique tooth back liner, machine multi-faceted open frame, screw or hydraulic opening device can replace the wearing parts, maintenance far more.
Through the above impact crusher will analyze the impact crusher during operation problems. iron ore beneficiation process plant
Bearing temperature is too high Remedy:
1) Check perhaps the amount of grease, bearing grease needs to be brimming with volume 50%;
2) cleaning bearings, replace grease;
3) the replacing of bearings.
Internally generated percussion machine exclusion method:
1) stop and cleanup the crushing chamber.
2) Read the lining with the fastening and also the gap amongst the hammer plus the liner;
3) the replacing broken pieces.
The material is way too large exclusion method:
1) by adjusting the top counter and shelf space or replace the liner plate hammer;
2) Adjust the location back frame, so all parties from the gap between the liner plus the uniform rack, rack of liner wear, replace the verdict. gold ore milling equipment
0 comentarios